Te Arai Links Villas

imgi_6_11062b_b2f21f4ad6ee4829b4a9b57a349075c6~mv2.jpg
Photo 24-06-2025, 7 26 02 PM (1).jpg

About The Project

We were engaged by Vivian Construction to deliver 24 hardwood decks nestled within the sand dunes at the stunning Te Arai Links golf course. The project was successfully completed within a 12-week timeframe, with a consistently high standard of workmanship maintained throughout.